Load and Energy Mangement

LOAD SHEARING
    ► All the load shearing data of individual DG can be seen in this screen.
    ► If DGs are running individually then every DG will follow the KW set point assigned to it.
    ► But if DGs are running parallel then load shearing will be according to the maximum capacity of every DG.
    ► If load on any source exceeds beyond the set point, the load breakers will start tripping one by one according to the priority assigned to every breaker.
    ► When consumption matches the generation, load shedding will stop.